All surfaces should be clean, dry and free from dirt, debris and other contaminates.
Minimum of 2/3 coats required.
Ensure timber is fully dry (allow 3 days) before laying plastic floor tiles, foam and rubber-backed carpets, loft insulation etc.
Treatment will typically dry in 1-3 days.
UPC|EAN | 5010212651452 |
---|---|
Brand | CUPRINOL |